The ZHONGJIN Wanji Power Generation Project is being constructed in two phases. Phase I is equipped with one 300-ton/hour high-temperature and high-pressure circulating fluidized bed boiler, two 90-ton/hour high-temperature and high-pressure coking waste heat boilers, and one 100MW condensing steam turbine generator unit. Upon completion, it will have a power generation capacity of 100MW. Currently, the company is actively preparing for the construction of the Phase II 135MW power generation project. After the completion of both phases, the total installed capacity will reach 235MW, making a significant contribution to the local power supply.
![]() |
![]() |
![]() |
![]() |